Your Home
24/7 Service
Automatic Delivery
Price Protection
Payment Options
Clean Fuels
Equipment
Energy Savings
Moving Soon?
Branch Locator
Apply Online
 
    
About Us Your Home Your Business Our Stores Community Employment
 

Worry free service — 24 hours a day, 7 days a week

Our Heating Equipment Protection Plans take the worry out of home comfort and ensure your heating system is tuned for peak performance and efficiency.

Our plans include an annual safety check, cleaning and tune up, plus 24-hour priority service and free labour and parts coverage based on the protection plan you choose.

For more information about which Heating Equipment Protection Plan is right for you, give us a call at 1-888-310-1924.

Silver Protection Plan

SILVER Protection Plan

Silver Protection Plan

GOLD Protection Plan

Silver Protection Plan

PLATINUM Protection Plan

Propane water heater and space heater protection Best for oil or propane warm air furnaces and boiler burners Extended boiler parts coverage for oil or propane equipment
  • Yearly Cleaning
  • 20 Point Inspection
  • Labour Included
  • Yearly Cleaning
  • 20 Point Plus Inspection
  • 30 Part Replacement Coverage
  • Labour Included
  • 24-Hour Emergency No Heat Service
  • $150.00 Credit Towards a New Oil Tank Installation*
  • Yearly Cleaning
  • 20 Point Plus Inspection
  • 47 Part Replacement Coverage
  • 24-Hour Emergency No Heat Service
  • $150 Credit Towards a New Oil Tank Installation*
Inspection includes: Inspection includes: Inspection includes:
  • Inspect and clean combustion chamber
  • Inspect and clean main burner orifice and primary air ports
  • Clean main burner
  • Clean front burner tube (if applicable)
  • Clean fan and air intake cavity
  • Clean firebox
  • Inspect gasket
  • Check chimney draw (if applicable)
  • Visually inspect venting (if applicable)
  • Test safety limits
  • Check and adjust pilot flame and ignition
  • Check fan speed control
  • Checked for cracked ceramic tile
  • Check and adjust for proper log position
  • Check and clean burner thermocouple
  • Pressure test the system
  • Inspect outside tank
  • Inspect gas lines
  • Inspect fittings
  • Leak check
  • Fan, housing, end cone, and air tube of burner
  • Glass gauge
  • Transformer connections
  • Ignition cable
  • Fuel pump and adjust pressure
  • Oil burner
  • Above ground oil tanks and lines for oil leaks
  • Fuel oil filters and strainers (Replaced if needed)
  • Electrodes and nozzle (Replaced if needed)
  • Air filters (Replaced annually, if supplied by customer)
  • Draft regulator
  • Lubricate all motor bearings
  • Vacuum and inspect heat exchanger and smoke pipe to chimney
  • Clean combustion chamber
  • Test transformer
  • Test oil burner controls and cycle unit
  • Test for CO2, smoke, stack temperature and vent draft
  • Side wall vent motor (if applicable - side wall vent parts not included)
  • Side wall vent wheel
  • Side wall vent pressure switch
  • Side wall vent hood
  • Side wall vent screened opening
  • Side wall vent pressure sensing tube

30 Part Replacement Coverage

  • Pump strainer
  • Air tube
  • Fuel filter – complete or element
  • Burner coupling
  • Burner fan
  • Burner motor
  • Burner switch
  • Burner transformer
  • Fuel pump
  • Ignition cable
  • Nozzle
  • Buss bar transformer leads
  • Cad cell assembly and eye
  • Delayed oil valve and coil
  • Electrodes
  • End cones
  • Ignition wiring
  • Ignition transformer
  • Low voltage wiring
  • Nozzle adapter
  • Nozzle line
  • Fan belts, motor, and motor pulley
  • Smoke pipe – 3 sections
  • Warm air furnace control
  • Draft regulator
  • Blower shaft
  • Blower bearings
  • Capacitor
  • Fan control
  • Altitude and pressure gauge
  • Fan, housing, end cone, and air tube of burner
  • Glass gauge
  • Transformer connections
  • Ignition cable
  • Fuel pump and adjust pressure
  • Oil burner
  • Above ground oil tanks and lines for oil leaks
  • Fuel filters and strainers (Replaced if needed)
  • Electrodes and nozzle (Replaced if needed)
  • Air filters (Replaced annually, if supplied by customers)
  • Draft regulator
  • Lubricate all motor bearings
  • Vacuum and inspect heat exchanger and smoke pipe to chimney
  • Clean combustion chamber
  • Test transformer
  • Test oil burner controls and cycle unit
  • Test for CO2, smoke, stack temperature and vent draft
  • Side wall vent motor (if applicable-side wall vent parts not included)
  • Side wall vent wheel
  • Side wall vent pressure switch
  • Side wall vent hood
  • Side wall vent screened opening
  • Side wall vent pressure sensing tube

30 part replacement coverage of Gold Plan PLUS 17 additional parts coverage for a hot water boiler system under 200,000 BTU’s:

  • Aquastat
  • Automatic air vent
  • Circular impeller
  • Circular motor mounts
  • Circular relays
  • Circular motor
  • Flow checks
  • Mixing valve
  • Relief valve
  • Zone valve stem
  • Zone valve motor
  • Zone valve complete
  • Pressure reducing valve
  • Bearing assembly
  • Water feed
  • Expansion tank (Diaphragm)
Pricing available at 1-888-310-1924.

 

*Labour extra for oil tank installation

*Labour extra for oil tank installation
** Up to three zones covered - $20.00 per year for each additional zone

  Pricing available at 1-888-310-1924. Pricing available at 1-888-310-1924.

Terms and conditions

Questions? Give us a call us at 1-888-310-1924.

   
    © copyright Irving Oil |  Site Map  |  Privacy |  Legal