- Inspect and clean combustion chamber
- Inspect and clean main burner orifice and primary air ports
- Clean main burner
- Clean front burner tube (if applicable)
- Clean fan and air intake cavity
- Clean firebox
- Inspect gasket
- Check chimney draw (if applicable)
- Visually inspect venting (if applicable)
- Test safety limits
- Check and adjust pilot flame and ignition
- Check fan speed control
- Checked for cracked ceramic tile
- Check and adjust for proper log position
- Check and clean burner thermocouple
- Pressure test the system
- Inspect outside tank
- Inspect gas lines
- Inspect fittings
- Leak check
|
-
Fan, housing, end cone, and air tube of burner
- Glass gauge
- Transformer connections
- Ignition cable
- Fuel pump and adjust pressure
- Oil burner
- Above ground oil tanks and lines for oil leaks
- Fuel oil filters and strainers (Replaced if needed)
- Electrodes and nozzle (Replaced if needed)
- Air filters (Replaced annually, if supplied by customer)
- Draft regulator
- Lubricate all motor bearings
- Vacuum and inspect heat exchanger and smoke pipe to chimney
- Clean combustion chamber
- Test transformer
- Test oil burner controls and cycle unit
- Test for CO2, smoke, stack temperature and vent draft
- Side wall vent motor (if applicable - side wall vent parts not included)
- Side wall vent wheel
- Side wall vent pressure switch
- Side wall vent hood
- Side wall vent screened opening
- Side wall vent pressure sensing tube
30 Part Replacement Coverage
- Pump strainer
- Air tube
- Fuel filter – complete or element
- Burner coupling
- Burner fan
- Burner motor
- Burner switch
- Burner transformer
- Fuel pump
- Ignition cable
- Nozzle
- Buss bar transformer leads
- Cad cell assembly and eye
- Delayed oil valve and coil
- Electrodes
- End cones
- Ignition wiring
- Ignition transformer
- Low voltage wiring
- Nozzle adapter
- Nozzle line
- Fan belts, motor, and motor pulley
- Smoke pipe – 3 sections
- Warm air furnace control
- Draft regulator
- Blower shaft
- Blower bearings
- Capacitor
- Fan control
- Altitude and pressure gauge
|
-
Fan, housing, end cone, and air tube of burner
- Glass gauge
- Transformer connections
- Ignition cable
- Fuel pump and adjust pressure
- Oil burner
- Above ground oil tanks and lines for oil leaks
- Fuel filters and strainers (Replaced if needed)
- Electrodes and nozzle (Replaced if needed)
- Air filters (Replaced annually, if supplied by customers)
- Draft regulator
- Lubricate all motor bearings
- Vacuum and inspect heat exchanger and smoke pipe to chimney
- Clean combustion chamber
- Test transformer
- Test oil burner controls and cycle unit
- Test for CO2, smoke, stack temperature and vent draft
- Side wall vent motor (if applicable-side wall vent parts not included)
- Side wall vent wheel
- Side wall vent pressure switch
- Side wall vent hood
- Side wall vent screened opening
- Side wall vent pressure sensing tube
30 part replacement coverage of Gold Plan PLUS 17 additional parts coverage for a hot water boiler system under 200,000 BTU’s:
- Aquastat
- Automatic air vent
- Circular impeller
- Circular motor mounts
- Circular relays
- Circular motor
- Flow checks
- Mixing valve
- Relief valve
- Zone valve stem
- Zone valve motor
- Zone valve complete
- Pressure reducing valve
- Bearing assembly
- Water feed
- Expansion tank (Diaphragm)
|